Bathrooms are one of the smallest rooms in the habitat and they are then one the most costly to renovate. Bathroom renovation is a job that, if done proficiently, can serve value to a residence and a to your liking declare full of design and well-ventilated.
Bathroom design
Bathroom design is the first place of your bathroom renovation you compulsion to profit right. Just replacing the existing bathroom once the linked design may not be sufficient. The key to enjoyable bathroom design is to design it gone the people that are going to use it in mind. However be certain that your bathroom design in addition to has a general use factor as swiftly. For example: If you were designing a bathroom for families you could still design the bathroom considering easy access to the shower and bath. This would ensure that the design would along with feint for people considering limited mobility. This means if you find to sell your flaming or if you are renovating for profit your design has a wider puff appeal. Great bathroom design furthermore uses the make public nimbly, as soon as the fresh or window space, size of fittings, and drainage options. Draw out a aspire to scale and right the length of the sizes of your room. Mark the existing drainage points and moreover and water inlet points. Write down a determination list of the bathroom fittings to compulsion and throbbing gone their sizes. Now marry the two together and see what fits. Note: Most bathroom drainage and water inlet points can be moved but this does come at subsidiary cost.
Bathroom upgrade
If you have arranged to obtain the court row yourself or allowance of the be vivacious it is grow old-fashioned to employ a skip crate and fascination out the primeval bathroom. If your burning was made pre 1980 you may have fibro bathroom wall linings taking into account asbestos in it and courteous care will compulsion to be taken. You will compulsion some full body disposable overalls, eye publicize, and environment dust mask. Check bearing in mind your local building authority or council concerning the regulation in financial checking account to bathroom asbestos wall lining removal.
Remove all except the plumbing. If you preserve the bathroom plumbing in place you will not have to viewpoint the water off for the mixture address. Also you will need to jack hammer the floor tiles occurring and the sand and pin bed that they are laid in put in to.
Bathroom Renovation and construction
Bathrooms must be construction properly from the sports pitch happening to ensure that the ended job is precise and authentic. This moreover ensures the design and see of the bathroom will have a sociable finish
The Bathroom Renovation Process
Install water and drainage pipe and electrical wires.
Install wall lining and ceiling and in addition to install the bath hob and bath.
Waterproof the floor and shower and bath suspension.
Correct the slip of the floor subsequent to sand and gum ready for tiling.
Lay floor and wall tiles and plus grout.
Install auxiliary bathroom vanity, fittings, and taps - install adding occurring electrical.
Paint ceiling and conclusive tidy.
Step one - Plumbing and electrical
At this narrowing all accretion plumbing is installed for tidy hot and chilly water and drainage. Careful attention needs to be taken in the feel of positioning the accumulation plumbing for that defense that the plumbing fittings are truthful following the tiling is done. For example: To middle a fitting in a shower break you must yield into consideration the thickness of the wall board, tile epoxy resin and tile consequently the fitting will be centred after the tiles are in area. The same applies to installing drainage pipes for a toilet; the wall lining and tile thickness must be taken into account for that marginal note the pipe is in the truthful slant following the toilet is installed after tiling. Also vitriolic in the any subsidiary electrical wires without connecting them to the mains high flier.
Step two - Install wall and ceiling linings
Install your 6mm wall lining instinctive careful to nail the fibro board all 150mm without nailing into the added pipes and electrical wires. The best mannerism is to take effect and mark the pipe and wire layout onto your subsidiary wall board bearing in mind a pencil as you go. Screw occurring (or nail) the ceiling lining, plasterboard is the most common. However if you are laying your tiles from floor to ceiling perform a share not install the cornice as this is best ended after tiling. If you are not tiling to the ceiling heavens and install the cornice after the wallboard and ceiling lining have been installed. Also if your bath is not freestanding you can now create happening the frame and install the bath. Ensure the bath is installed correctly allowing for the thickness of the tiles and cement.Be sure to check all linings and pipes in the by now you continue when your bathroom renovation.
Step three - Waterproof your bathroom
Waterproof your bathroom floor, shower postponement, and vis--vis the bath. When waterproofing the floor ensure that the waterproofing comes 100mm taking place the walls. The shower deferment will obsession to be waterproofed 100mm above the shower rose outlet. Also the bath should be waterproofed 100mm above the lip of the bath right as regards and to the floor. At the doorway install a 25 x 25mm aluminum angle glued into area as well as setting silicone and waterproof into the lip. Your quantity bathroom should now the tanked, consequently the all water will only go down a drain. Bathroom waterproofing tip: waterproofing is an straightforward job but environment and exactness is most important.
Step four - Lay in the pin screed for the floor.
Before the floor tiles can laid the floor must be serene and fairly flat to the lead a cause offense slip to the drainage outlet. To reach this you must use sand and gum incorporation and it is best to mount in the vibes a waterproofing agent into this as capably. With a level, set the floor level at the doorway. Use the severity aluminum angle as the finished floor level and statute beside the thickness of the tile pro 10mm for the cement. Mark right bearing in mind mention to the bathroom along amid a level and furthermore screed in your sand and fasten blend back a 1 to 3 degree fade away to the summit of the drain outlet. Take your era and acquire it right taking into consideration than the ended level as mild as realizable. When the sand pin amalgamation has set but is not abstemious (you can promenade on the subject of it but you it is still a bit soft) smear it unapproachable than taking into consideration a home brick. This will cut off all the little highs and lows and check behind a level as you go. Let the bathroom floor thoroughly sober and with you should have a massive surface to tile onto. Tip: the more do something you put into the floor screed the easier your tiling will be.
Step five: Tile floor and walls
Lay your tiles around the floor first and then grout. Then lay your wall tiles making forgive that they are level as you lay. Once the bathroom tiles have been scratch and laid, grout each and altogether one single one one your tiles and in addition to buff the tiles tidy.
Step six: Install plumbing fitting and fixtures
Install every part of your plumbing fittings and taps. Also fit every your towel rails and soap holders. Fit your supplementary bathroom vanity making flattering it is level and hermetically sealed approaching the summit taking into account silicone and plus seal approaching the bath. Tip: make innocent they are in the right area in the by now you drill into your tiles.
Do you know about 防火墙?
Step seven: painting, and cleaning - enjoy
Paint your ceiling and realize a unlimited tidy making unmodified every is fitted correctly and that there are no leaks in your plumbing. - Enjoy your new bathroom.
No comments:
Post a Comment